1 00:00:07,110 --> 00:00:04,470 first jeff williams will be exiting the 2 00:00:08,950 --> 00:00:07,120 quest airlock on his fifth spacewalk and 3 00:00:12,150 --> 00:00:08,960 followed by kate rubins 4 00:00:14,390 --> 00:00:12,160 jeff will lead from the airlock up onto 5 00:00:16,390 --> 00:00:14,400 the main truss segment 6 00:00:17,830 --> 00:00:16,400 because of the distance of the radiator 7 00:00:19,990 --> 00:00:17,840 from the airlock it's actually on the 8 00:00:21,429 --> 00:00:20,000 end of the truss out p6 9 00:00:23,189 --> 00:00:21,439 jeff will be 10 00:00:24,550 --> 00:00:23,199 taking the safe tethers of both crew 11 00:00:26,950 --> 00:00:24,560 members out 12 00:00:28,870 --> 00:00:26,960 and setting them up on p1 13 00:00:30,310 --> 00:00:28,880 to allow enough reach 14 00:00:31,910 --> 00:00:30,320 for them from the airlock all the way 15 00:00:33,750 --> 00:00:31,920 out to p6 16 00:00:35,190 --> 00:00:33,760 and while he's taking care of that kate 17 00:00:37,670 --> 00:00:35,200 will wait 18 00:00:39,110 --> 00:00:37,680 at the airlock for him to set that up 19 00:00:40,869 --> 00:00:39,120 and then he'll head out towards the 20 00:00:42,630 --> 00:00:40,879 solar off-roader joint the sarge and 21 00:00:46,389 --> 00:00:42,640 then followed by kate who will come 22 00:00:48,549 --> 00:00:46,399 after she will follow that same path and 23 00:00:50,150 --> 00:00:48,559 follow her tether to meet jeff out there 24 00:00:52,869 --> 00:00:50,160 before they both head out to the prime 25 00:00:58,229 --> 00:00:52,879 task on the eva which is retracting the 26 00:01:03,670 --> 00:01:00,150 as we've mentioned this uh previously 27 00:01:05,270 --> 00:01:03,680 tried to retract this on usc va 33 28 00:01:06,469 --> 00:01:05,280 and 29 00:01:08,070 --> 00:01:06,479 they had a lot of other tasks that they 30 00:01:09,030 --> 00:01:08,080 had to do and 31 00:01:11,190 --> 00:01:09,040 were unable to get to this one 32 00:01:13,350 --> 00:01:11,200 successfully but we were taking this as 33 00:01:15,910 --> 00:01:13,360 our prime task and we'll go ahead and 34 00:01:18,630 --> 00:01:15,920 knock it out first on the eva 35 00:01:20,870 --> 00:01:18,640 so once both crew get outboard of the 36 00:01:23,190 --> 00:01:20,880 sarge there they'll inspect 37 00:01:24,390 --> 00:01:23,200 the radiator and the various mechanisms 38 00:01:26,710 --> 00:01:24,400 around it to make sure none of them will 39 00:01:29,270 --> 00:01:26,720 be in the way as we retract it both the 40 00:01:30,630 --> 00:01:29,280 shroud and there are six inches rotated 41 00:01:31,749 --> 00:01:30,640 are located around it that they'll 42 00:01:33,990 --> 00:01:31,759 inspect 43 00:01:35,910 --> 00:01:34,000 kate will translate around the zenith 44 00:01:37,670 --> 00:01:35,920 side of that truss and 45 00:01:39,830 --> 00:01:37,680 jeff on the nader looking at the 46 00:01:43,190 --> 00:01:39,840 radiator to make sure it's prepared for 47 00:01:46,789 --> 00:01:44,870 once they've completed their inspections 48 00:01:49,670 --> 00:01:46,799 jeff will move into place 49 00:01:51,830 --> 00:01:49,680 to take his pistol grip tool or pgt 50 00:01:54,389 --> 00:01:51,840 power tool to retract the radiator 51 00:01:56,149 --> 00:01:54,399 manually while kate gets in position to 52 00:01:57,990 --> 00:01:56,159 view the radiator's retraction to make 53 00:02:00,310 --> 00:01:58,000 sure it goes smoothly 54 00:02:01,590 --> 00:02:00,320 now with its location uh facing forward 55 00:02:03,030 --> 00:02:01,600 on the iss we'll have good views from 56 00:02:05,510 --> 00:02:03,040 the ground as well to help the crew 57 00:02:07,510 --> 00:02:05,520 monitor its retraction 58 00:02:10,710 --> 00:02:07,520 you see here kate will slide out board 59 00:02:11,910 --> 00:02:10,720 and get a view of the radiator 60 00:02:13,430 --> 00:02:11,920 while jeff 61 00:02:17,030 --> 00:02:13,440 puts himself in the outboard side in 62 00:02:21,350 --> 00:02:19,350 as i stated we attracted it previously 63 00:02:23,110 --> 00:02:21,360 and we've got the video here of 64 00:02:25,270 --> 00:02:23,120 what we hope to see on this attempt is a 65 00:02:28,390 --> 00:02:25,280 nice smooth retraction of 66 00:02:29,430 --> 00:02:28,400 the radiator as it comes down 67 00:02:31,190 --> 00:02:29,440 and 68 00:02:33,509 --> 00:02:31,200 gets retracted fully to protect it from 69 00:02:34,869 --> 00:02:33,519 the mod and 70 00:02:39,509 --> 00:02:34,879 thermal conditions as i've mentioned 71 00:02:44,229 --> 00:02:42,229 assuming a nice clean retraction there 72 00:02:45,830 --> 00:02:44,239 and they've got it seated fully 73 00:02:47,750 --> 00:02:45,840 the crew will work to install four 74 00:02:48,790 --> 00:02:47,760 cinches much as you would 75 00:02:52,309 --> 00:02:48,800 the 76 00:02:54,949 --> 00:02:52,319 in a cross pattern diagonally from each 77 00:02:56,710 --> 00:02:54,959 other installing two cinches here 78 00:02:58,710 --> 00:02:56,720 and then they will slide and work a 79 00:03:00,270 --> 00:02:58,720 cross pattern two additional cinches and 80 00:03:03,270 --> 00:03:00,280 work back and forth 81 00:03:04,790 --> 00:03:03,280 a couple times at each bolt to get the 82 00:03:09,670 --> 00:03:04,800 radiator fully cinched and compressed 83 00:03:13,190 --> 00:03:11,910 after fully securing all four of the 84 00:03:15,270 --> 00:03:13,200 cinches 85 00:03:17,589 --> 00:03:15,280 the next step is to deploy a thermal 86 00:03:18,550 --> 00:03:17,599 cover in order to fully protect the 87 00:03:21,030 --> 00:03:18,560 radiator 88 00:03:22,630 --> 00:03:21,040 gets uh both thermal protection and 89 00:03:27,110 --> 00:03:22,640 micro media orbital debris protection 90 00:03:31,670 --> 00:03:28,789 and deploying that shroud over the 91 00:03:33,350 --> 00:03:31,680 radiator will complete the 92 00:03:42,149 --> 00:03:33,360 retraction of the radiator and the the 93 00:03:45,910 --> 00:03:43,750 so here you see the crew they'll move 94 00:03:47,830 --> 00:03:45,920 the shroud which was stowed by a 95 00:03:50,309 --> 00:03:47,840 previous crew that deployed the radiator 96 00:03:51,910 --> 00:03:50,319 sunny williams on aki hushidi and 97 00:03:53,990 --> 00:03:51,920 they'll deploy that and cinch it tight 98 00:03:56,070 --> 00:03:54,000 to protect that radiator 99 00:03:57,589 --> 00:03:56,080 moving on for the second set of tasks on 100 00:03:59,190 --> 00:03:57,599 the eva jeff will pick up a foot 101 00:04:01,750 --> 00:03:59,200 restraint here and make his way back 102 00:04:04,149 --> 00:04:01,760 inboard to the ssr mess or the canon arm 103 00:04:05,589 --> 00:04:04,159 2 for the high definition camera task 104 00:04:07,750 --> 00:04:05,599 that zeb mentioned 105 00:04:09,190 --> 00:04:07,760 while kate is translating back all the 106 00:04:10,470 --> 00:04:09,200 way the airlock to retrieve those 107 00:04:19,670 --> 00:04:10,480 cameras 108 00:04:23,030 --> 00:04:21,030 so she'll pick up a both a high 109 00:04:24,950 --> 00:04:23,040 definition camera and a light from the 110 00:04:26,950 --> 00:04:24,960 airlock uh to put on the camera port 111 00:04:28,790 --> 00:04:26,960 nine worksite that's on the nadir side 112 00:04:30,310 --> 00:04:28,800 of the port one truss 113 00:04:33,189 --> 00:04:30,320 while jeff will meet 114 00:04:34,790 --> 00:04:33,199 the ssrms that's being driven by 115 00:04:36,870 --> 00:04:34,800 jackson crew member 116 00:04:38,310 --> 00:04:36,880 takuya anishi 117 00:04:40,469 --> 00:04:38,320 who will then 118 00:04:42,070 --> 00:04:40,479 drive the arm in on under jeff's 119 00:04:43,430 --> 00:04:42,080 guidance such so that they can get the 120 00:04:44,310 --> 00:04:43,440 foot restraint installed and the safe 121 00:04:49,110 --> 00:04:44,320 tether 122 00:04:55,030 --> 00:04:51,030 while jeff is installing that kate will 123 00:04:57,030 --> 00:04:55,040 come out to meet him with his bag of 124 00:04:58,550 --> 00:04:57,040 oru so that he can install them on the 125 00:05:03,670 --> 00:04:58,560 the nader side of the trust there that 126 00:05:06,390 --> 00:05:05,110 after picking up his bag they'll 127 00:05:07,990 --> 00:05:06,400 maneuver the 128 00:05:19,350 --> 00:05:08,000 the arm down to the nader side of the 129 00:05:22,870 --> 00:05:21,029 so following retrieving that bag for 130 00:05:24,550 --> 00:05:22,880 jeff kate will have some secondary tasks 131 00:05:25,749 --> 00:05:24,560 that she'll go off to 132 00:05:28,070 --> 00:05:25,759 at the 133 00:05:29,749 --> 00:05:28,080 solar alpha rotary joint the sarge 134 00:05:32,710 --> 00:05:29,759 cinching those bolts as i've mentioned 135 00:05:34,629 --> 00:05:32,720 and also doing a sarge inspection 136 00:05:36,550 --> 00:05:34,639 so still translate outboard grab some 137 00:05:38,550 --> 00:05:36,560 tools that you'll need for those tasks 138 00:05:40,950 --> 00:05:38,560 and then head back around to tighten the 139 00:05:43,270 --> 00:05:40,960 three remaining bolts of 140 00:05:45,270 --> 00:05:43,280 the sarge there were a fourth one that 141 00:05:47,590 --> 00:05:45,280 was previously tightened on usb 33 and 142 00:05:49,350 --> 00:05:47,600 they saw improvement in the data 143 00:05:50,629 --> 00:05:49,360 so they decided that the remaining three 144 00:05:53,189 --> 00:05:50,639 bolts would 145 00:05:55,110 --> 00:05:53,199 hopefully finish the job there 146 00:05:56,469 --> 00:05:55,120 so kate will translate around three 147 00:05:58,870 --> 00:05:56,479 corners and 148 00:06:01,270 --> 00:05:58,880 give us good photos and 149 00:06:02,870 --> 00:06:01,280 video close out as she goes ahead and 150 00:06:04,790 --> 00:06:02,880 tightens those bolts and secures the 151 00:06:07,110 --> 00:06:04,800 thermal booties around them 152 00:06:09,189 --> 00:06:07,120 previously on usb 33 they saw one of the 153 00:06:10,469 --> 00:06:09,199 booties was dislodged and in order to 154 00:06:11,990 --> 00:06:10,479 make sure that 155 00:06:13,430 --> 00:06:12,000 if the if need be if the velcro is 156 00:06:16,469 --> 00:06:13,440 degraded on those booties that they can 157 00:06:18,830 --> 00:06:16,479 put a wire tie to secure them in place 158 00:06:20,629 --> 00:06:18,840 so it'll translate around to 159 00:06:24,150 --> 00:06:20,639 multiple 160 00:06:24,160 --> 00:06:27,749 second one and then a third one 161 00:06:30,950 --> 00:06:29,510 and depending on timing here and 162 00:06:32,950 --> 00:06:30,960 lighting conditions of how the uva is 163 00:06:35,990 --> 00:06:32,960 going she will complete a sarge 164 00:06:38,790 --> 00:06:36,000 inspection previously on sts-134 the 165 00:06:40,150 --> 00:06:38,800 crew did lube the port sarge and the 166 00:06:42,390 --> 00:06:40,160 ground has done some testing to see how 167 00:06:44,629 --> 00:06:42,400 that lube will hold up over time and 168 00:06:46,790 --> 00:06:44,639 we'll get kate's on-site inspection to 169 00:06:48,870 --> 00:06:46,800 verify that the ground testing is 170 00:06:50,790 --> 00:06:48,880 matching up with what happens on orbit 171 00:06:52,070 --> 00:06:50,800 and we'll catch that during uh sometime 172 00:06:54,469 --> 00:06:52,080 during when the day passes and she'll 173 00:06:56,870 --> 00:06:54,479 come swing by here give us her report 174 00:07:03,909 --> 00:06:56,880 and take photos of that for 175 00:07:08,629 --> 00:07:05,909 and while she's working on that jeff 176 00:07:09,749 --> 00:07:08,639 will work in here he'll first change out 177 00:07:12,230 --> 00:07:09,759 this light 178 00:07:14,150 --> 00:07:12,240 this is the a light that has 179 00:07:16,230 --> 00:07:14,160 burnt out its bulbs and once we get 180 00:07:18,150 --> 00:07:16,240 complete chin up the rpcm rnr that zeb 181 00:07:20,230 --> 00:07:18,160 mentioned they'll have a good heater 182 00:07:22,390 --> 00:07:20,240 circuit there for the light new light to 183 00:07:24,150 --> 00:07:22,400 be put in its place and make this camera 184 00:07:25,350 --> 00:07:24,160 fully functional 185 00:07:26,710 --> 00:07:25,360 and on the side of the standard 186 00:07:27,990 --> 00:07:26,720 definition camera that's already there 187 00:07:29,670 --> 00:07:28,000 we'll install an additional high 188 00:07:31,430 --> 00:07:29,680 definition camera so they'll be 189 00:07:37,430 --> 00:07:31,440 co-located to get both standard def and 190 00:07:45,749 --> 00:07:40,710 and jeff will clean up his work site and 191 00:07:49,510 --> 00:07:47,589 following uh kate's sarge inspection 192 00:07:51,350 --> 00:07:49,520 test she will move back outboard towards 193 00:07:55,110 --> 00:07:51,360 the radiator worksite that we previously 194 00:07:56,869 --> 00:07:55,120 were at we have some overu's that are 195 00:07:59,510 --> 00:07:56,879 pump flow control subassemblies that are 196 00:08:01,990 --> 00:07:59,520 ammonia pumps for the outboard elements 197 00:08:04,230 --> 00:08:02,000 and those pumps had previously failed 198 00:08:06,550 --> 00:08:04,240 and they are under an mli blanket and to 199 00:08:10,150 --> 00:08:06,560 enable future change out of these boxes 200 00:08:12,629 --> 00:08:10,160 by the spdm dexter the kate will fold 201 00:08:14,629 --> 00:08:12,639 back that mli and tie it back and so a 202 00:08:18,710 --> 00:08:14,639 future spacex mission can bring up 203 00:08:21,510 --> 00:08:20,230 and so the since the 204 00:08:22,950 --> 00:08:21,520 mli was never designed for robotic 205 00:08:26,309 --> 00:08:22,960 compatibility she'll just tuck that out 206 00:08:27,749 --> 00:08:26,319 of the way and wire tied in place 207 00:08:29,749 --> 00:08:27,759 that'll complete the main task 208 00:08:31,589 --> 00:08:29,759 objectives on the eva for the day so 209 00:08:33,509 --> 00:08:31,599 jeff will uh 210 00:08:35,190 --> 00:08:33,519 guide talking the arm back to 211 00:08:37,990 --> 00:08:35,200 same position he got in 212 00:08:39,670 --> 00:08:38,000 and he'll egress the arm and stow both 213 00:08:40,389 --> 00:08:39,680 his foot restraint and remove his tether 214 00:08:41,670 --> 00:08:40,399 from 215 00:08:48,230 --> 00:08:41,680 the arm and get back on the structure 216 00:08:52,470 --> 00:08:50,710 once he's cleaned up the arm and allowed 217 00:08:54,710 --> 00:08:52,480 talk to move to the overnight park 218 00:08:57,590 --> 00:08:54,720 position he they will take the foot 219 00:09:02,070 --> 00:08:57,600 restraint installed on the cedar cart 220 00:09:05,590 --> 00:09:04,470 and then the crew will repeat uh a 221 00:09:07,670 --> 00:09:05,600 reverse 222 00:09:09,350 --> 00:09:07,680 direction of their egress and jeff will 223 00:09:11,350 --> 00:09:09,360 meet up at the tether anchor point while 224 00:09:12,710 --> 00:09:11,360 kate heads back to the airlock and they 225 00:09:14,389 --> 00:09:12,720 will 226 00:09:17,670 --> 00:09:14,399 use their tethers to move their way back 227 00:09:21,190 --> 00:09:17,680 to the airlock and ingress for a 228 00:09:22,470 --> 00:09:21,200 hopefully successful u.s eva 37 229 00:09:24,070 --> 00:09:22,480 and then we'll get jeff back inside for